You already know us

Solar and storage, sized for your property

We are the team behind Pool Solutions. Through ITRS International Ltd. we now bring seventeen years of European EPC work — 216 MWp installed — to solar and battery storage in Seychelles.

650+Projects in Europe
216 MWpInstalled capacity
17 yrsEPC experience
4.2 hPeak sun, daily

What the Government pays

Two rebate schemes. One for your home, one for your business.

Both pay a fixed amount for every kilowatt-peak installed. Most people on the islands know the schemes exist. Far fewer know the conditions — and the conditions are where projects are lost.

Residential PV Rebate

SCR 10,500
per kWp installed
Systems up to 3 kWp — a maximum rebate of SCR 31,500.

For individuals who own and occupy the property where the system is installed. An owner's house on its own PUC meter qualifies; a rental unit does not.

PV Rebate 2.0 — Small Business

SCR 7,200
per kWp installed
Systems up to 15 kWp — a maximum rebate of SCR 108,000.

Approved by Cabinet on 15 April 2026. The detailed scheme rules have not yet been published; we will post them here when they are.

Will I actually get it?

    We prepare and submit the application with you. We do not decide it — the Energy Commission does.

    The ceiling is the trap. It applies to the whole system, not to the part that is paid for. A 16 kWp business system does not collect the rebate on its first 15 kWp — it collects nothing. Which is why, when a property lands just above a ceiling, we design to the ceiling and say so.

    The range

    Three systems. Start where you are, grow from there.

    Every system is a Base Unit — inverter and battery in one cabinet — and Expansion Batteries added later without touching the inverter or the wiring. One system sits behind one PUC meter and supplies only that meter's circuit.

    Storage figures are nominal capacity. The array a system can carry is set by its inverter, not by its battery — which is why the two small platforms take four panels and the Estate takes a roof.

    What it costs

    How we get to a price

    A system is not one product with one price. It is three parts, and only one of them comes in fixed steps.

    The core

    A Base Unit, plus however many Expansion Batteries the property needs. Fixed price per item — this part comes in steps.

    The array

    The number of panels, priced per kilowatt-peak installed. This part is continuous, which is why no fixed kit ever fits a real roof exactly.

    Installation

    Mounting, cabling, protection, commissioning and the PUC paperwork. Part fixed per system, part scaling with the array.

    A range on the page, a figure after the survey

    The sizing tool gives you a range. It is honest to within about fifteen per cent, and it is enough to know whether the project is worth a conversation. The exact figure follows the site survey, because these things cannot be seen from a web page:

      Above the largest system we publish no range at all. A property that size needs parallel units, a distribution board and a conversation with PUC. We measure it rather than estimate it.

      Find your size

      Three minutes, and you will know

      Your monthly bill says how much electricity the property uses. It does not say when — and when is what decides whether you need a battery and how large it should be. The tool asks for both, then gives you a system, a range and the rebate that applies.

      • One system per PUC meter — the tool sizes each meter on its own.
      • Most properties have more than one meter. This is where estimates usually go wrong.
      • Print it or save it as a PDF at the end.
      • No cost, no obligation, and nothing to install.

      Why solar here

      Seychelles has the sun and the tariffs

      Few places combine this much irradiation with this much electricity cost. That combination, not a subsidy, is what makes the arithmetic work.

      4.2 peak sun hours

      Four degrees south of the Equator. Tilt matters more than orientation, which simplifies almost every rooftop.

      SCR 4.27 – 5.20 per kWh

      The commercial tariff. Every kilowatt-hour you generate yourself is a kilowatt-hour you do not buy.

      Power cuts stop mattering

      Storage carries lighting, refrigeration, wifi and the reception desk through an outage. Guests never learn there was one.

      Fuel you do not import

      Generation on the islands is heavily diesel-fired. Every locally produced kilowatt-hour is foreign exchange that stays here.

      The grid

      Net metering, export, and the 50% cap

      Net metering

      What your system generates is offset against what you draw. Generate less than you use and you pay the difference; generate more and PUC credits it. This is the mechanism that turns midday production into a smaller bill.

      Domestic supplies may offset up to 100% of consumption. Commercial supplies above 10 kW may be sized to cover only 50%.

      Zero export

      A zero-export system runs in parallel with the grid but never feeds into it. A current transformer at the connection point holds the inverter back so nothing leaves the property. Nothing is exported, so there is nothing for the network to absorb.

      The Energy Commission has indicated to us verbally that a zero-export installation is treated like any other system, takes part in the support schemes, and is not subject to the 50% cap. We have asked for that in writing and will publish the answer here.

      Above 100 kW the rules change entirely. An installation of that size falls under the independent power producer regime, which is a different process with a different timetable. We will say so at the first meeting rather than the fifth.

      How it goes

      From the first visit to the first kilowatt

      Most small systems are commissioned three to four weeks after the order.

      Site assessment — free

      We walk the roof, read the meters, look at shading and at the distribution board, and establish how many PUC meters the property actually has.

      Proposal

      System design per meter, components, price in SCR and EUR, expected production, and which rebate the property qualifies for.

      Rebate application

      We prepare and submit it. Claims must reach the Commission within six months of commissioning, and funds are allocated first-come, first-served.

      Financing, if you want it

      We help with the paperwork for DBS, the SME scheme, SEEREP or MCB, and say plainly which one fits your case.

      PUC and Commission approval

      The application goes to the Energy Commission and on to PUC, which surveys the premises and the network before granting permission to connect.

      Installation and handover

      Our team installs and commissions the system. Production is visible on your phone from the first day, and the warranty paperwork is handed over with the keys.

      Who we are

      Seventeen years of building these, in four countries

      ELSOL has been an EPC contractor for photovoltaic plants since 2008, across Bulgaria, Germany, Italy and Austria. In Seychelles we work through ITRS International Ltd. — the company behind the pool systems many establishments here already use.

      2008Established
      550,263Panels installed
      175,200 tCO₂ avoided per year
      650+Projects completed

      Registered here

      ITRS International Ltd., registered and licensed in the Republic of Seychelles. Local presence, local support.

      Built to the standard

      Installations follow the national electrical regulatory framework and the Commission's technical requirements for PV.

      Still here in five years

      Around twenty-six companies have entered this market since 2009 and most did not last. A warranty is worth what the company behind it is worth.

      Financing

      Four routes, after the rebate

      The rebate reduces what the system costs. These reduce what it costs to pay for it.

      DBS Eco-Loan

      Development Bank of Seychelles. Covers panels, inverters, batteries and installation. Explicitly available for PV at tourism establishments.

      SME Scheme

      Government scheme through the commercial banks, for businesses with turnover under SCR 6M. Up to seven years at 5–7%.

      SEEREP

      Up to SCR 100,000 at 5%, one to five years. Residential customers only — it does not apply to a hotel or a guesthouse.

      MCB Green Loan

      Green energy financing for MCB account holders, covering solar PV and other renewables.

      Terms change. Confirm the current conditions with the institution before you commit — and take an accountant's view before signing anything.

      Get in touch

      Let's look at your property

      The site assessment costs nothing and commits you to nothing. We come, we measure, and you get a proposal you can compare with anyone else's.

      Telephone
      Office
      Victoria, Mahé

      ITRS International Ltd.